Power
200 MW
Colocation Space
340.0K sqft
Overview
62-acre campus with 200MW capacity. $900M green financing secured. NVA05A (36MW) and future 48MW HYPERSTACK expansion.
Key Points
- •200 MW total campus capacity on 62 acres
- •NVA05A: 36MW, 262,000 sqft powered shell
- •Future 48MW HYPERSTACK build-to-suit
- •$900M green financing secured
- •Adjacent to NOVEC substation expansion
- •100% renewable energy, low-water-use design
Development Details
Total Investment
$1B
Spec Sheet (PDF)
Mar 2026