Microsoft Hillcrest Campus in South Hill, Virginia (Azure East US region). Part of reduced plan from original 8-building 336MW design due to wetland protection.
Key Points
- •Part of Azure East US availability zone in Virginia
- •Original design: 8 buildings, 336MW (five 48MW, one 28.8MW, one 19.2MW)
- •Plan reduced to protect wetland/stream features
- •Microsoft operates 12 Azure data centers in Virginia
- •Azure regions: East, East 2, US DoD East, US Gov Virginia
- •315MW solar purchase in Virginia (2018) - largest US corporate solar deal