Microsoft AzureOperational

Microsoft Hillcrest Campus

210 Tunstall Road, Richmond, Virginia
Azure Global Infrastructure
Power

48 MW

Colocation Space

252.0K sqft

Overview

Microsoft Hillcrest Campus in South Hill, Virginia (Azure East US region). Part of reduced plan from original 8-building 336MW design due to wetland protection.

Key Points

  • Part of Azure East US availability zone in Virginia
  • Original design: 8 buildings, 336MW (five 48MW, one 28.8MW, one 19.2MW)
  • Plan reduced to protect wetland/stream features
  • Microsoft operates 12 Azure data centers in Virginia
  • Azure regions: East, East 2, US DoD East, US Gov Virginia
  • 315MW solar purchase in Virginia (2018) - largest US corporate solar deal
VerifiedSource: Azure Global Infrastructure