DCQ
VantageOperational

Ashburn I (VA1)

Sterling, Virginia
Vantage Data Centers
Power

206 MW

Colocation Space

1.0M sqft

Power Density

0.3 kW/rack

Overview

The Ashburn I (VA1) campus is a 52-acre facility that will house six multi-story data centers with flexible 3MW and 4MW data modules.

Key Points

  • 52-acre campus will house six multi-story facilities at full build out
  • Offers more than 1 million square feet of space and 206MW of capacity
  • Features N+1 redundancy across all power systems and N+2 redundancy across all mechanical systems
  • Uses closed-loop chilled water system with air-side economizers and Computer Room Air Handling units
  • Campus features flexible 3MW and 4MW data modules to meet IT requirements

Infrastructure

UPS Redundancy

N+1

Cooling Redundancy

N+2

Security

24x7 securityCCTVBiometricPerimeter security gates and fencingDual authenticationVisitor management system
VerifiedSource: Vantage Data Centers