Power
86 MW
Colocation Space
925.0K sqft
Power Density
0.3 kW/rack
Overview
The Quebec City campus spans 30 acres with four data centers offering 86MW of critical IT load across 925,000 square feet with density options up to 300W/SF.
Key Points
- •Campus spans 30 acres and features four state-of-the-art data centers
- •Offers 86MW of critical IT load across 925,000 square feet
- •Utilizes nearly 100% hydroelectric power from Hydro-Quebec
- •Has six Meet-Me-Rooms (MMRs) for network redundancy throughout the campus
- •Uses outside air economization up to 86 percent of the year for free cooling
Certifications
QC21: Tier III Certification of Design Documents, Uptime InstituteQC21: Tier III Certification of Constructed Facility, Uptime Institute
Infrastructure
UPS Redundancy
N+1
Cooling Redundancy
N+1
Security
24x7x365 video surveillanceon-site securitybiometric identificationfacial recognition entryCCTVvisitor management system
Spec Sheet (PDF)
Mar 2026
Sources: