Power
5 MW
Colocation Space
96.9K sqft
Overview
The HKG1 data center is located in the New Territories of Hong Kong with a 10-minute drive from the ports of Huanggang and Lo Wu.
Key Points
- •Offers 5MW of critical IT load capacity
- •90k square feet (8K square meters) facility size
- •Located in New Territories of Hong Kong, 10-minute drive from Huanggang and Lo Wu ports
- •Power provided by China Light & Power Company Limited (CLP) with 2N UPS redundancy
- •Features carrier neutral connectivity with two points-of-entry for maximum path diversity
Certifications
ISO 9001ISO 20000ISO 27001ISO 14001
Infrastructure
UPS Redundancy
2N UPS redundancy
Cooling Redundancy
N+1 redundancy via a water-cooled chiller
Security
24x7 securityCCTVBiometricTwo-factor door access controlPerimeter security gates