Power
64 MW
Colocation Space
556.2K sqft
Power Density
0.3 kW/rack
Overview
The Milan I data center campus will be located on more than 30 acres in Milan with 517,000 square feet and will offer 64MW of critical IT load with 300W/SF average density.
Key Points
- •30 acre (12 hectares) campus with 4 data centers
- •517,000 square feet (48,000 square meters) with 64MW of critical IT load
- •300W/SF (3.2kW/M²) average density
- •On-campus substation at 220KV with power provided by Enel and Terna
- •Closed-loop chilled water system with air-side economizers and WUE near zero
Development Details
Land Size
30 acres
Infrastructure
UPS Redundancy
N+1
Cooling Redundancy
N+1 overall, N+2 component-level redundancy across mechanical systems
Security
24x7x365 securityCCTVK4-rated fencingdual authenticationvisitor management system