Liquid Cooling
Power
300 MW
Colocation Space
1.0M sqft
Overview
JHB1 is a 73-acre campus in Sedenak Tech Park featuring three data centers with 300MW critical IT load and flexibility to support both air-cooled and liquid-cooled GPU loads.
Key Points
- •73 acre (30 hectares) campus with 3 data centers
- •300MW of critical IT load across the campus
- •930K+ square feet (87K+ square meters) of space
- •First facility is operational with remaining facilities currently under development
- •Hybrid liquid-and-air cooled GPU cluster deployments supported
- •Power provided by dedicated dual 275kV power feeds from Tenaga Nasional Berhad (TNB)
Certifications
EDGE
Infrastructure
UPS Redundancy
N+1
Cooling Redundancy
N+2 component-level redundancy
Security
24x7 securityCCTVperimeter security gates and fencingvisitor management systemcontrolled access points