Power
48 MW
Colocation Space
419.8K sqft
Power Density
0.3 kW/rack
Overview
The Warsaw data center campus will be comprised of two, four-story data centers on a 12-acre site located a half hour drive from Warsaw-Chopin International Airport.
Key Points
- •Campus will be sited on more than 12 acres (five hectares) just a half hour drive from Warsaw-Chopin International Airport
- •Once fully developed, the 390,000 square foot (36,000 square meters) campus will be comprised of two, four-story, state-of-the-art data centers
- •Combined 48MW of critical IT load with 300W/SF (3.23kW/M²) average density
- •Power provided by Innogy, the leading energy provider in the region
- •Uses a highly efficient closed-loop chilled water system generated through air-cooled chillers with integrated economizer capability
Development Details
Land Size
12 acres
Buildings (Planned)
2
Total Space (Planned)
0.4M sqft
Infrastructure
UPS Redundancy
N+1
Cooling Redundancy
N+1 overall, N+2 component-level redundancy across mechanical systems
Security
24x7 securityCCTVK12-rated fencingdual authenticationvisitor management system
Spec Sheet (PDF)