Power
64 MW
Colocation Space
486.0K sqft
Overview
CA3 is a four-story facility on an eight-acre campus with 486,000 square feet and 64MW of critical IT capacity, opening to customers in late 2025.
Key Points
- •Located within a two-mile radius of CA1 and CA2 campuses and close to Norman Y. Mineta San Jose International Airport
- •Situated on nearly eight acres with more than 486,000 square feet and 64MW of critical IT capacity in one four-story facility
- •Powered by Silicon Valley Power using 100% renewable energy with opening scheduled for late 2025
- •Features N+1 redundancy across all electrical systems and N+2 redundancy across all mechanical systems
- •Uses closed-loop chilled water system with air-side economizers and Water Utilization Efficiency near zero
Development Details
Land Size
8 acres
Timeline
First Building:late 2025
Infrastructure
UPS Redundancy
N+1
Cooling Redundancy
N+2
Security
24x7 securityCCTVBiometricPerimeter security gates and fencingDual authenticationVisitor management system
Spec Sheet (PDF)
Mar 2026
Sources: