Power
237 MW
Colocation Space
1.8M sqft
Overview
Switch's iconic Pyramid Campus. Largest in Eastern US. Up to 320MW, 1.8M sq ft at full build.
Key Points
- •237MW current, up to 320MW planned
- •1.8M sq ft at full build
- •Iconic pyramid design (former Steelcase)
- •100% green energy powered
- •Tier 5 Platinum certified
- •Opened May 2017
Spec Sheet (PDF)
Mar 2026
Sources: