Liquid Cooling
Power
495 MW
Colocation Space
2.0M sqft
Overview
Switch's flagship Las Vegas campus. 2M+ sq ft operational, 4.6M sq ft at full build. Tier 5 Platinum.
Key Points
- •495MW at full build-out
- •11 operating data centers, 2M+ sq ft
- •Tier 5 Platinum certification
- •Liquid cooling available (hosting Nvidia GB300 for CoreWeave)
- •Powered by 179MW Switch Solar project
- •FedRAMP, FISMA, HIPAA certified
Spec Sheet (PDF)
Mar 2026