Power
430 MW
Colocation Space
2.0M sqft
Overview
Switch's flagship Las Vegas campus. Currently 2M+ sq ft / 315MW operational. LAS VEGAS 10 opened 2024. AI factories under construction for 2MW+/cabinet.
Key Points
- •Currently 2+ million sq ft, 315MW operational
- •LAS VEGAS 10 opened 2024: 350,000 sq ft, 40MW
- •Full buildout: 5.2 million sq ft, 430MW
- •100% renewable energy powered since Jan 2016 (Switch Solar)
- •AI factories under construction: 2MW+ per cabinet capability
- •Tier 5 Platinum certified, FedRAMP/FISMA/HIPAA/ISO 27001
Mar 2026