Switch The Core Campus Las Vegas

7135 South Decatur Boulevard, Las Vegas, Nevada
Switch
Power

430 MW

Colocation Space

2.0M sqft

Overview

Switch's flagship Las Vegas campus. Currently 2M+ sq ft / 315MW operational. LAS VEGAS 10 opened 2024. AI factories under construction for 2MW+/cabinet.

Key Points

  • Currently 2+ million sq ft, 315MW operational
  • LAS VEGAS 10 opened 2024: 350,000 sq ft, 40MW
  • Full buildout: 5.2 million sq ft, 430MW
  • 100% renewable energy powered since Jan 2016 (Switch Solar)
  • AI factories under construction: 2MW+ per cabinet capability
  • Tier 5 Platinum certified, FedRAMP/FISMA/HIPAA/ISO 27001
VerifiedSource: Switch