Power
40 MW
Colocation Space
1.2M sqft
Overview
Switch Las Vegas 10 opened 2017 at The Core Campus. 350,000 sq ft, 40MW. MOD 250 design, Tier 5 Platinum. 100% renewable energy since 2016.
Key Points
- •Opened 2017 as part of The Core Campus
- •350,000 sq ft, 40MW (MOD 250 design)
- •Switch Tier 5 Platinum standard
- •100% renewable energy (Switch Solar)
- •Brought Core Campus to 2M+ sq ft, 315MW total
- •Clients include AWS, eBay, Intel, PayPal, NASA
Certifications
ISO 27001SOC 2Tier IVLEED Platinum
Mar 2026