Overview

Switch Las Vegas 10 opened 2017 at The Core Campus. 350,000 sq ft, 40MW. MOD 250 design, Tier 5 Platinum. 100% renewable energy since 2016.

Key Points

  • Opened 2017 as part of The Core Campus
  • 350,000 sq ft, 40MW (MOD 250 design)
  • Switch Tier 5 Platinum standard
  • 100% renewable energy (Switch Solar)
  • Brought Core Campus to 2M+ sq ft, 315MW total
  • Clients include AWS, eBay, Intel, PayPal, NASA

Certifications

ISO 27001SOC 2Tier IVLEED Platinum
VerifiedSource: Switch