DCQ
SwitchOperational

Switch SuperNAP 11

7135 South Decatur Boulevard, Las Vegas, Nevada
Switch
Power

180 MW

Colocation Space

1.1M sqft

Overview

Part of Switch's Core Campus in Las Vegas. Construction began alongside SuperNAP 10. Part of 495MW campus at full buildout. Tier 5 Platinum, 100% renewable.

Key Points

  • Part of Switch Core Campus (The Core)
  • Construction started after SuperNAP 9
  • Core Campus total: 2M+ sq ft, 315MW operational
  • Full buildout: 495MW, 5.2M sq ft
  • 100% renewable energy (Switch Solar)
  • Tier 5 Platinum standard

Certifications

ISO 27001SOC 2Tier IVLEED Platinum
VerifiedSource: Switch
Mar 2026