Power
180 MW
Colocation Space
1.1M sqft
Overview
Part of Switch's Core Campus in Las Vegas. Construction began alongside SuperNAP 10. Part of 495MW campus at full buildout. Tier 5 Platinum, 100% renewable.
Key Points
- •Part of Switch Core Campus (The Core)
- •Construction started after SuperNAP 9
- •Core Campus total: 2M+ sq ft, 315MW operational
- •Full buildout: 495MW, 5.2M sq ft
- •100% renewable energy (Switch Solar)
- •Tier 5 Platinum standard
Certifications
ISO 27001SOC 2Tier IVLEED Platinum
Mar 2026
Sources: