Power
1400 MW
Colocation Space
3.7M sqft
Overview
The Frontier campus in Shackelford County, Texas is a 1,200-acre development that will deliver 1.4GW of critical IT capacity across 10 single-story data centers spanning more than 3.7 million square feet, with the first data center scheduled for delivery in the second half of 2026.
Key Tenant: Oracle/OpenAI Stargate
Key Points
- •1,200-acre campus with 10 data centers and 1.4GW of critical IT load across 3.7 million square feet
- •Located in Shackelford County, Texas, a few hours drive from Dallas-Fort Worth metroplex and Austin
- •Will utilize liquid cooling to enable next generation GPU workloads and can accommodate ultra high-density racks of 250kW+
- •Features N+1 redundancy across systems and uses a highly efficient closed-loop chiller system with near zero Water Utilization Efficiency
- •First data center scheduled for delivery in the second half of 2026
Development Details
Land Size
1.2K acres
Total Investment
$25B
Buildings (Planned)
10
Total Space (Planned)
3.7M sqft
Rack Density
250+ kW
Permanent Jobs
250
Timeline
Groundbreaking:2025
First Building:H2 2026
Full Buildout:2029
Certifications
LEED
Infrastructure
UPS Redundancy
N+1
Cooling Redundancy
N+1
Security
24x7 securityCCTVBiometricperimeter fencingaccess badge/PIN
Spec Sheet (PDF)
Mar 2026