Overview
Part of CloudHQ's MCC Campus in Manassas. MCC1 facility with 41.6MW critical power, fully leased since 2017.
Key Points
- •MCC1: 41.6 MW critical power
- •460,248 sq ft facility
- •Fully leased since 2017
- •Part of 100-acre MCC Campus