Power
142 MW
Overview
CloudHQ's 98-acre campus in Culpeper Tech Zone. 3 buildings totaling 2.1M sq ft, 142MW critical power. Site work started 2025. Adjacent to Equinix CU1-4.
Key Points
- •98 acres in McDevitt Technology Zone, acquired for $12M
- •3 data centers: CLP1 (50MW), CLP2 (50MW), CLP3 (42MW)
- •Total 2.1 million sq ft, 142 MW critical power
- •On-site substation, adjacent to Equinix Culpeper Campus (CU1-4)
- •Site work started 2025 alongside DataBank project
- •Part of Culpeper Technology Zone development wave
Development Details
Land Size
98 acres
Buildings (Planned)
3
Total Space (Planned)
2.1M sqft
Mar 2026