CloudHQUnder Construction

CloudHQ Culpeper Campus

McDevitt Drive, Culpeper, Virginia
CloudHQ
Power

142 MW

Overview

CloudHQ's 98-acre campus in Culpeper Tech Zone. 3 buildings totaling 2.1M sq ft, 142MW critical power. Site work started 2025. Adjacent to Equinix CU1-4.

Key Points

  • 98 acres in McDevitt Technology Zone, acquired for $12M
  • 3 data centers: CLP1 (50MW), CLP2 (50MW), CLP3 (42MW)
  • Total 2.1 million sq ft, 142 MW critical power
  • On-site substation, adjacent to Equinix Culpeper Campus (CU1-4)
  • Site work started 2025 alongside DataBank project
  • Part of Culpeper Technology Zone development wave

Development Details

Land Size

98 acres

Buildings (Planned)

3

Total Space (Planned)

2.1M sqft

VerifiedSource: CloudHQ
Mar 2026