Fredericksburg (VA4)
Fredericksburg, Virginia, United States, Fredericksburg, Virginia
Liquid Cooling
Power
192 MW
Colocation Space
929.0K sqft
Overview
The VA4 data center campus in Fredericksburg, Virginia will be home to three two-story facilities on an 82-acre campus with the first building slated to be operational late 2027.
Key Points
- •Located on 82-acre campus with three two-story facilities offering combined critical IT load of 192MW
- •Campus will include 929,000 square feet of space designed with average density of 500kW per row
- •First building slated to be operational late 2027, with additional phases rolling out through 2028
- •Private 270MW on-site substation providing reliable, dedicated power from Dominion Energy
- •Features closed-loop chilled water system with Water Utilization Efficiency (WUE) near zero
Development Details
Land Size
82 acres
Total Investment
$2B
Buildings (Planned)
3
Total Space (Planned)
0.9M sqft
Permanent Jobs
50
Timeline
First Building:late 2027
Certifications
LEED-certified
Infrastructure
UPS Redundancy
N+1 redundancy across its electrical systems
Cooling Redundancy
N+1 redundancy across all mechanical systems
Security
24x7 securityCCTVBiometricPerimeter security gates and fencingDual authenticationVisitor management system
Spec Sheet (PDF)
Mar 2026