DCQ
VantageUnder ConstructionAI-Ready

Fredericksburg (VA4)

Fredericksburg, Virginia, United States, Fredericksburg, Virginia
Vantage Data Centers
Liquid Cooling
Power

192 MW

Colocation Space

929.0K sqft

Overview

The VA4 data center campus in Fredericksburg, Virginia will be home to three two-story facilities on an 82-acre campus with the first building slated to be operational late 2027.

Key Points

  • Located on 82-acre campus with three two-story facilities offering combined critical IT load of 192MW
  • Campus will include 929,000 square feet of space designed with average density of 500kW per row
  • First building slated to be operational late 2027, with additional phases rolling out through 2028
  • Private 270MW on-site substation providing reliable, dedicated power from Dominion Energy
  • Features closed-loop chilled water system with Water Utilization Efficiency (WUE) near zero

Development Details

Land Size

82 acres

Total Investment

$2B

Buildings (Planned)

3

Total Space (Planned)

0.9M sqft

Permanent Jobs

50

Timeline

First Building:late 2027

Certifications

LEED-certified

Infrastructure

UPS Redundancy

N+1 redundancy across its electrical systems

Cooling Redundancy

N+1 redundancy across all mechanical systems

Security

24x7 securityCCTVBiometricPerimeter security gates and fencingDual authenticationVisitor management system