Overview

The Quincy (WA1) campus is a 68-acre facility with three data centers totaling 775,000 square feet and 89MW of critical IT load, powered by Grant County Power Utility District offering the lowest per-KW rates in the country.

Key Points

  • 68-acre campus with 3 data centers totaling 775,000 square feet and 89MW of critical IT load
  • Power provided by Grant County Power Utility District, offering the lowest per-KW rates in the country
  • Features N+1 redundancy across all mechanical systems and closed-loop chilled water system with air-side economizers
  • Security personnel onsite 24x7x365 with minimum of five layers of security protecting each customer's data module
  • WA11 holds multiple Uptime Institute Tier III certifications and LEED Gold certification

Development Details

Land Size

68 acres

Total Investment

$1B

Certifications

WA11: Tier III Certification of Design Documents, Uptime InstituteWA11: Tier III Certification of Constructed Facility, Uptime InstituteWA11: Tier III Gold Certification of Operational Sustainability, Uptime InstituteWA11: LEED Gold Certified, U.S. Green Building Council

Infrastructure

Cooling Redundancy

N+1 redundancy across all mechanical systems

Security

24x7 securityCCTVfive layers of securityvisitor management systems