Power
89 MW
Colocation Space
775.0K sqft
Overview
The Quincy (WA1) campus is a 68-acre facility with three data centers totaling 775,000 square feet and 89MW of critical IT load, powered by Grant County Power Utility District offering the lowest per-KW rates in the country.
Key Points
- •68-acre campus with 3 data centers totaling 775,000 square feet and 89MW of critical IT load
- •Power provided by Grant County Power Utility District, offering the lowest per-KW rates in the country
- •Features N+1 redundancy across all mechanical systems and closed-loop chilled water system with air-side economizers
- •Security personnel onsite 24x7x365 with minimum of five layers of security protecting each customer's data module
- •WA11 holds multiple Uptime Institute Tier III certifications and LEED Gold certification
Development Details
Land Size
68 acres
Total Investment
$1B
Certifications
WA11: Tier III Certification of Design Documents, Uptime InstituteWA11: Tier III Certification of Constructed Facility, Uptime InstituteWA11: Tier III Gold Certification of Operational Sustainability, Uptime InstituteWA11: LEED Gold Certified, U.S. Green Building Council
Infrastructure
Cooling Redundancy
N+1 redundancy across all mechanical systems
Security
24x7 securityCCTVfive layers of securityvisitor management systems
Spec Sheet (PDF)
Mar 2026