DCQ
VantageUnder ConstructionAI-Ready

Port Washington (WI1)

Port Washington, Wisconsin, Port Washington, WI
Vantage Data Centers
Power

902 MW

Colocation Space

2.5M sqft

Overview

The Port Washington Lighthouse campus spans 672 acres and will include four single-story data centers totaling 902MW across 2.5 million square feet, scheduled to be completed in 2028.

Key Tenant: Oracle/OpenAI Stargate

Key Points

  • Campus spans 672 acres and will include four single-story data centers
  • Total capacity of 902MW of critical IT load across 2.5 million square feet
  • Scheduled to be completed in 2028
  • 70% of campus power will originate from zero-emission energy resources including solar, wind and battery storage
  • Will use closed-loop chilled water system with Water Utilization Efficiency (WUE) near zero

Development Details

Land Size

1.9K acres

Total Investment

$8B

Permanent Jobs

1.0K

Timeline

Groundbreaking:December 2025
Full Buildout:2028

Certifications

LEED

Infrastructure

UPS Redundancy

N+1

Cooling Redundancy

N+1

Security

24x7 securityCCTVBiometricForce resistant perimeter securityDual authenticationVisitor management system